Colorado Springs metro
Where your jobs run
Accounting built around the local construction market.
Construction only
Not generic bookkeeping
Job costing, WIP, and retainage handled the way contractors need.
Remote-first
Across Colorado
Full support without an in-house hire, anywhere you build.
Colorado Springs is unusual among mid-size construction markets because so much of the work reaches contractors through a single procurement door. The Front Range Multiple Award Construction Contract is an indefinite delivery, indefinite quantity vehicle used to buy design-build, sustainment, repair, alteration, renovation and minor construction across Peterson Space Force Base, Schriever Space Force Base, Cheyenne Mountain Space Force Station, the United States Air Force Academy, Fort Carson including the Pinon Canyon Maneuver Site, and other Front Range installations. Winning a seat on it does not give you one job. It gives you a queue.
That is a bookkeeping shape most files are not built for. Task orders come in at wildly different sizes, from small orders under the simplified acquisition threshold to multi-million dollar builds, and they overlap. Three or four can be running at once on three different installations with different access requirements, different wage determinations and different completion dates. If the office opens one customer record for the base and books everything to it, the file has quietly stopped being able to answer the only question that matters, which is whether a given order was worth taking.
The second thing that breaks is cadence. Most construction bookkeeping is built around a monthly close, and a monthly close is fine for a private remodel. It is not fine when Davis-Bacon requires a certified payroll for every single week that contract work is performed, with a signed statement of compliance. A month-end habit means five weeks of certified payroll assembled at once from memory and paper timesheets, which is how classifications drift, fringe amounts get rounded and a payment gets held.
Then there is the ordinary local friction on top: gate and escort time that nobody codes anywhere, material receipts from a run to a supplier on Powers that could belong to any of three jobs, and permit paperwork from Pikes Peak Regional Building Department that gets filed with the drawings instead of against the job cost. None of that is exotic. It is just the daily volume of a Pikes Peak contractor, and it compounds fast when the file cannot tell one task order from another.